2020-12-23
Beijing Daxing International Airport Project in China
Beijing Daxing International Airport was opened on September 30, 2019. The terminal building, with an area of more than 1million m2, is the second-largest single-building after Istanbul Airport.
Based on the characteristics of airport power monitoring systems, our solution integrates the online data, offline data and user data to build a complete power automation system. As a result, the following functions can be achieved under various conditions:
- Powerm monitoring, control and protection
- On-site control of power consumption
- Electrical management syste
These solutions greatly reduce operating costs of the airport, improve energy efficiency and prevent potential risks.
Solução relacionada