2020-12-25
250kW/1MWh Energy Project of Shanghai SAIC AnYo Charging Technology Co., Ltd.
Solution:
Adopt 250kW PCS and 1MWh Ithium-ion phosphate battery, on-grid/off-grid switch system, EMS and other systems.
Significance & value:
1. The system stores power during off-peak hours and discharges power during peak hours to achieve peak shaving
2. Reduce the peak load of power grid to a certain extent to facilitate the safe operation of power grid
3. Improve the demand response at user side and realize multi-party interest balance